toilet washing mould

Products Details

Product Detail

Quick Details
Place of Origin: Zhejiang, China (Mainland) Product Material: P20H, 718H, 2316, Nak80, S136 Mold life: 30K, 50K, 100K HRC: 32-48
Brand Name: none Product: toilet washing mould Runner: hot or cold Payments item: half and half
Model Number: EHMF Name: injection molded plastic parts manufacturers, toilet washing mould Software: Pro-E, UG, regular worker, CAD T1 time: 30days after drawing confirmed
Shaping Mode: Plastic Injection Mould Other name: fittings molding , auto parts mould , plastic injection molding Mold base: LKM, ODM Guaranty: 1 year
  Packaging Delivery
Packaging Details Wooden carton
Delivery Details 35-45 DAYS
  injection molded plastic parts manufacturers, toilet washing mould Product Description Specifications of injection molded plastic parts manufacturers, toilet washing mould:
mould material 45#, P20, H13, 718, 2738, NAK80, S136 etc.
mould base LKM, HASCO etc.
Cavity Single/multi
Mould life P20: 300,000-500,000 shots    2316 718H: 500,000 shots     S136 H13: 700,000 shots
Design software UG, PROE, CAD etc.
Plastic material PP, PE, ABS, PC etc.
Delivery time 35-45 days
Specification According to client’s requirements
1. Samples/drawing&requirement from you 2. Mould design: we will communicate and exchange the opinion with you after you place order. 3. Material Purchase: Steel cutting and mould base tooling. 4. Assembling. 5. Inspection of mould: following and controlling the tooling processing. 6. Mould testing: We will inform you the date. Then will send the sample’s inspection report and injection parameters with the sample to you! 7. Your instruction&confirmation for shipment. 8. Ready-made mould before packing. Package of injection molding: 1. Wooden carton, 2. shipping by sea, by load, 3. We also can produce any plastic parts for you. We have 25 different ton injection machines. Pictures of injection molded plastic parts manufacturers, toilet washing mould: Company Information
1.  Office corner office corner 2.  Equipments Equipments 3.Working place Working place 4.  Package and delivering package and delivering
5. Certification 俄罗斯认证证书 (1) WRAS ISO14001 ISO9001  
FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service
1. How about your payments item ? Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery). 2. Delivering time ? Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering . 3. Ability of producing ? We have all tooling machine for making molds, we can provide 30-50 sets of injection plastic mould every month .

 

   

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours