structural reaction injection molding

Products Details

Quick Details

Place of Origin: Zhejiang, China (Mainland) Product Material: P20H ,718H, 2316 ,Nak80 ,S136 Mold life: 30K,50K,100K HRC: 32-48
Brand Name: none Product: auto parts mould Runner: hot or cold Payments item: half and half
Model Number: EHM17 Name:structural reaction injection molding Solfware: Pro-E, UG, solide worker, CAD T1 time: 30days after drawing confirmed with both side
Shaping Mode: Plastic Injection Mould Other name: injection molding , mold dies , plastic mold machine Mold base: LKM, ODM Guaranty: 1 year

Packaging Delivery

Packaging Details: structural reaction injection molding  packing: Wooden carton
Delivery Detail: 35-45 DAYS
structural reaction injection molding
Product Description
Specifications of  structural reaction injection molding:
mould material 45#,P20,H13,718,2738,NAK80,S136 etc.
mould base LKM,HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould life P20:300,000-500,000 shots
2316 718H:500,000 shots
S136 H13:700,000 shots
Design software UG,PROE,CAD etc.
Plastic material PP,PE,ABS,PC etc.
Delivery time 35-45days
Specification According to client’s requirements

1.Samples/Drawing &Requirement from you

2.Mould design:we will Communicate&Exchange the opinion with you after you place order.

3.Material Purchase:Steel cutting and Mould base tooling.

4.Assembling.

5.Inspection of mould : following and controlling the tooling processing.

6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!

7.Your instruction &confirmation for shipment.

8.Ready made mould before packing.

Package of  injection molding :

1. Wooden carton , 2. shipping by sea ,by load , 3. We also can produce any plastic parts for you . We have 25 different ton injection machine . Pictures of structural reaction injection molding: A (30) A (29) A (28) A (27)
Company Information
1.  Office corner office corner 2.  Equipments Equipments 3.Working place Working place 4.  Package and delivering 
5. Certification 俄罗斯认证证书 (1) WRAS ISO14001 ISO9001
FAQ
Why choose us?
1, Prompt response with 24hours.
2,Good Quality. If as technical skill Lifelong free repair.
3,Reasonable price.
4, Stronger engineer team Support R&D.
5, Good After-sale service
1. How about your payments item ? Payment Item:50% deposit after confirming the drawings and 50% balance after comfirming te samplse(before delivery). 2. Delivering time ? Generally , T1 time is 30 days after drawings confirmed both side, then the samples approved , 5 days later it can be delivering . 3. Ability of producing ? We have all tooling machine for making molds, we can provide 30-50 sets of molds every month . structural reaction injection molding

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours